The Work Sequence When Flipping Houses From Start to Finish


Visit http://flipyourfirsthouse.com/ to get my Deal Analyzer spreadsheet for FREE. This spreadsheet instantly calculates your potential profit, so you know whether or not a deal is worth pursuing.

There’s a sequence of events you should follow with fixing & flipping real estate. In this episode, you’ll learn what order work should be completed from start to finish.

You can watch the next episode in the series, “House Flipping Tips – How to Find Affordable, Quality Contractors” here:https://www.youtube.com/watch?v=p7T2_YJwPjM

Visit https://www.youtube.com/playlist?list=PLdD_oUkUm7kFSKITVHlXafDRs1fLUt_Va to see a complete listing of every episode in the “How to Flip Houses” series.


7 Responses to The Work Sequence When Flipping Houses From Start to Finish

  1. Andrew Gutierrez

    This was AWESOME man. Thank u so much for your videos. I'm proof that your videos are very beneficial to the public. The LA again

  2. Hernando Arce

    excellent exactly what i was looking for

  3. Critical Thinkman

    Great Topic, just what i needed. Thank you. But what about multifamily rehabs.

    What order would you sequence this? There is an old motel I would like to buy. It was turned into 12 one bedroom apartments. It is one long building. 12 apartments in a row. I want to rehab the 6 units in series first, starting on the right. Then do the other 6 on the other side once the previous 6 units are all rented.

    Parking lot is gravel and needs to be paved with black top tar. Windows need to be replaced. Roof is new. All siding needs to be replaced. All front and back doors need to be replaced. The building currently has 6 tenants in it and there are all kinds of wiring from cable and satelite dishes everywhere and many are not even used from years of new installations. it's a mess.

    When should I do the siding?

    I was thinking do:
    1. parking lot first because of all the gravel dust and digging, then tar
    2. Then do Windows
    3. Interior Demolition next
    4. Then Hang new doors
    5. Electric, gas pipes, plumbing
    6. Run Exterior Exterior Electric Wiring
    7. Drywall
    8. Paint Walls
    9. Hang Pre-hung Interior Doors
    9. Cut Trim/Pain Trim/Hang Trim
    10. Cabinets
    11. Floors
    12. Demolition Exterior Siding
    13. Install Exterior Electric Boxes
    12. Then put new Aluminum Siding whole building…. Last ?????

    Is this the order you would do it in? If not what order would you do it in (and why if possible.)

  4. Maylin Ravelo

    very good information.

  5. Zeyad Abdulkareem

    wonderful advice , thanks !

  6. Manuel Boullosa

    Great videos, Iam learning alot and feeling more confident to get into this business.

  7. Qawi Smith

    Thanks for your video. I'm starting my first flip and I'm doing my due diligence. Thank you